UA Little Rock Jack Stephens Arena Renovation

UA Little Rock Jack Stephens Arena Renovation

UA Little Rock Jack Stephens Arena Renovation

Industry:
Client:
UA Little Rock

Description:

Murray Contractors was called in on Christmas break to assist with multiple emergency floods due to extremely cold temperatures; one of the most significant projects being the Jack Stephens Arena basketball floor. Murray mobilized crews within a few hours and began water mitigation in an effort to salvage the floor and minimize the damage. Inevitably the floor was not salvable due to the amount of water, so from the time Murray arrived on site to the time the temporary playing floor was installed was a mere 12 days. And this was accomplished during the holiday break before their next game! We are here for our clients when they need us and we go the extra mile.