Through the JOC contract with UAMS, Murray Contractors was hired to make repairs to the UAMS campuses underground Heating/Cooling water loop system. The Victaulic joints that were installed on the system originally failed and required emergency repairs. Repairs were made to 10″, 16″ and 36″ underground lines. Relocation of utilities placed after the loop was installed was also required. The project involves great coordination due to working in the campus setting with heavy equipment, large excavations, and temporary street colures. Some areas were worked on a 24/7 shift because of the critical areas they served and minimization of downtime was the utmost importance. This project was fully commissioned.